Rx Renovation Xperts completely remodeled the entire condo in Burnt Store Marina in Punta Gorda.  Below is the spec sheet on what was performed for this beautiful remodel:
Kitchen Remodel:
  • Plans/drawings for review and sign off.
  • Remove customer appliances.
  • Demolition/removal of all kitchen cabinetry, counter tops, removal of walls enclosing existing refrigerator location, remove existing pantry and shelving area in dining area, remove existing walls and closet in dining area back to water heater closet. Remove all lowered ceiling in kitchen area. Removal of all flooring in kitchen/dining area. 
  • Build/install necessary framing and blocking to all same areas listed above to prepare for sheet rock. Areas to include new ceiling height, finished wall where closet was removed and new wall to enclose dining room from hallway.
  • Provide licensed plumber to install new water shut offs to sink water supply and complete rough plumbing for inspection including water line for new refrigerator location.
  • Provide licensed electrician to install up to 6 Recessed light cans, 2 pendant light bases, all necessary light switches and outlets to meet code. Wires ran for under cabinet lighting. All light fixtures to be provided by customer.
  • Install sheet rock to areas of walls/ceilings affected by demolition of kitchen.
  • Spray and create knock down finish to all same sheet rocked areas plus all ceiling in kitchen. 
  • Prime and paint all kitchen walls and ceiling with customer approved paint.
  • Install Espresso PARKAY forest 12mm flooring and baseboard to kitchen and dining area.
  • Install CHOICE cabinetry ( ) style cabinets according to approved plans. All accessories, fillers, panels and skins included. Kitchen layout plan subject to change at final measure. Upper cabinets to include crown molding. 
  • Install customer approved granite counter tops to all newly installed kitchen cabinetry including under mount sink. Install of customer provided kitchen sink faucet and customer provided door and drawer pulls.
  • Provide licensed plumber to connect plumbing to new sink, water line and drain to dishwasher and water line for ice maker. 
  • Install customer provided appliances including necessary hookups.
  • Install customer provided backsplash.
Flooring:
  • Remove all flooring from entire home and dispose of. (Will also be noted in other sections of this SOW).
  • Remove all base board from entire home.
  • Clean and wet mop all sub flooring.
  • Install customer approved flooring in all same area.
Master Bathroom:
  • Plans/drawings for review and sign off.
  • Demo/Remove existing toilet, vanity, counter top, sink, entire shower area removed to framing and sub floor, removal of existing tub area to framing and sub floor. Remove any lowered soffit ceiling in entire bathroom. Removal of all wall paper in bathroom.
  • Remove all flooring and base board from entire bathroom.
  • Provide licensed plumber to install new water shut offs for sink and toilet. Install 1 ½ - 2 foot wide column in new shower location (where tub used to be) and install shower valve piping in column. Install/Pour new shower pan in new shower location. Cap off any piping from old shower location.
  • Provide licensed electrician to upgrade all switches and outlets to meet code and run any necessary wiring for new lighting. ( All light fixtures to be provided by customer).
  • Install framing to create closet where old shower location was.
  • Install sheet rock to all affected areas of bathroom walls and ceiling and spray knockdown finish to all areas of walls and ceiling.
  • Prime and paint all walls and ceiling of bathroom with customer approved paint.
  • Install 12"x24" Happy Floors porcelain tile flooring and base board to bathroom floor.
  • Install Durarock to shower walls.
  • Install customer approved shower floor and wall tile.
  • Install customer approved bathroom floor tile and base boards.
  • Install customer approved vanity, counter top and sink. 
  • Install customer provided sink faucets, shower head, door and drawer pulls, light fixtures, towel bars, mirrors and any other bathroom accessories.
  • Install existing toilet with new wax ring.
Guest Bathroom:
  • Plans/drawings for review and sign off.
  • Demo/Remove existing toilet, vanity, sink, counter top, tub area to framing and sub floor, remove soffit above vanity and tub area and remove all wall paper. Removal of all base board and flooring in bathroom.
  • Install new tub and Durarock to all walls of tub area.
  • Build half wall for tub area.
  • Install 12"x24" Happy Floors porcelain tile flooring and base board to bathroom floor.
  • Spray/create knockdown finish to all walls and ceiling of bathroom.
  • Prime and paint all walls and ceilings of bathroom with customer approved paint.
  • Install customer approved tub wall tile.
  • Install customer approved toilet, vanity, counter top and sink.
  • Install customer provided sink faucets, shower head, door and drawer pulls, light fixtures, towel bars, mirrors and any other bathroom accessories.
  • Install new shower door.
Crown Molding:
  • Install customer approved crown molding to living room, dining area and all hallways.
Paint:
  • Entire home to be painted including all walls, ceilings, base board, door casings and doors with Rx provided, customer approved (Standard Sherwin Williams interior paint product).

New Kitchen
New Kitchen
New Kitchen
New Bedroom
New Bathroom
New Bathroom Shower